Location: |
Estevan, SK |
Sector: |
heavy-industrial |
Industry: |
Utilities |
This building is part of SaskPower’s upgrade for the Boundary Dam E Carbon Capture project. This building was specifically designed to house the equipment for the heat rejection process. The building features a built-up deck roof system, non-combustible mineral wool Roxul cavity wall system, and a monorail crane system. MBG also designed and fabricated an exterior ladder/platform system for roof access.