Location: |
Burnaby, BC |
Sector: |
light-industrial |
Industry: |
Oil & Gas |
MBG was contracted by FortisBC to supply and install (2) self-framer steel buildings for their Lower Mainland Intermediate Pressure System Upgrade project in Burnaby, BC. Due to the close proximity to residential/commercial areas, we vinyl wrapped the building with a green nature graphic to help it blend in with the surroundings.