Location: |
Village of Carmacks, Yukon |
Sector: |
light-industrial |
Industry: |
Water Treatment |
A pre-engineered metal building was used for this waste water treatment plant featuring 5” (R36) insulated wall panels and 6” (R43) insulated standing seam roof panels. The 3,000 sqft building featured two different roof slopes (4:12 and 2.5:12) and a small overhang.