BC Hydro Minette Substation Control Building

Location:

Kitimat, BC

Sector:

  • heavy-industrial

  • Industry:

    Utilities

    MBG worked with our client Empirica Infrastructures to supply and install a Control Building at the BC Hydro Minette Substation located in Kitimat, BC. The building was designed to Post-Disaster design requirement and utilized Kingspan Insulated Metal Panels for the building envelope. MBG worked diligently with the project consultant, John Wood Group, to successfully meet the stringent requirements of the project specifications and quality assurance.


    Request a quote for your next project